How to Do a Workload Analysis: A Step-by-Step Method
Report

How to Do a Workload Analysis: A Step-by-Step Method

İlhan Çağlar
12 Ağu 2026
7 min read
Share:LinkedInX
What is workload analysis? It multiplies the average handling time of every task in a unit by its annual volume to calculate total workload in hours. Divide that by effective capacity per person and you get the workforce norm.

Workload analysis is the most frequently skipped — and most decisive — step in any headcount discussion. Without it, every staffing decision favours the unit that says "we can't keep up" the loudest. Below are the six steps we use in the field.

Step 1 — Build a task inventory

List the work done in each role. The rule: a task should be concrete enough to have a measurable output, and aggregated enough not to drown the list. Eight to twenty tasks per unit is usually right. "Answering email" is not a task; "logging a customer request in the system" is.

Step 2 — Measure average handling time

  • System data: ERP, contact centre or ticketing logs are the most reliable source.
  • Employee logs: a simple two-week record separates perception from reality.
  • Manager estimates: use only to validate the other two; on their own they run systematically high.

Step 3 — Collect annual volume data

Find how often each task repeats per year. Where seasonality exists, a monthly breakdown is essential: a unit needing 3 people in January and 1 in August cannot be planned on an average.

Step 4 — Calculate effective capacity per person

ItemAnnual hours
Gross working time (52 weeks × 45 hours)2,340
Annual leave and public holidays-320
Training and development-40
Sickness and absence-60
Meetings and administration-320
Effective capacity1,600

The numbers differ by company; what matters is calculating the required headcount on real capacity, not on 2,340 hours. A typical white-collar range is 1,550-1,700 hours per year.

Step 5 — Build the calculation table

Formula: (Average time × Annual volume) ÷ 60 = Annual workload hours. Sum every task and divide by effective capacity.

TaskAnnual volumeTime (min)Workload (hours)
Candidate screening interview72035420
Job posting and shortlisting96120192
Offer and onboarding process11090165
Reporting and data entry25025104
Total——881

881 ÷ 1,600 = 0.55 people. This hiring volume alone does not fill a full-time recruiter; the role should either absorb other tasks or the volume should grow.

Step 6 — Interpret the result

  • Norm < current: question the process first. Excess usually comes from redundant approvals and manual data entry.
  • Norm > current: extra headcount is not the only answer; automation, outsourcing and task reallocation belong on the table.
  • Norm ≈ current: the number is right but the competency mix may not be. Look at who does what.

Once results sit on the org chart, the number of layers and team size per manager can also be discussed with numbers. Together, these two outputs form the backbone of an organization design project.

Frequently asked questions

How long does it take?

Two to three weeks for a single unit; typically 6-10 weeks for a mid-sized company end to end.

Will measurement unsettle employees?

Participation stays high when it is clear the goal is process improvement, not performance appraisal. Reporting results at unit level protects trust.

To make a quick start for your own unit, IC Consulting's Workforce Check-Up assesses your workload and headcount balance in 12 minutes.
İlhan Çağlar

Author

İlhan Çağlar

Founder & Senior Consultant

For more than 25 years, he has structured HR processes for large and matrix organizations in Finance, Telecommunications, Energy and Logistics. He held corporate roles at Learnship, ING, Türk Telekom, SOCAR and Boltas.

Since you read this article

Workforce Planning Check-Up

See your headcount efficiency and right-sizing with an AI-powered report.

Start the Check-Up5 minutes · Instant AI-powered report

Subscribe to Newsletter

Subscribe to our monthly newsletter to stay updated on developments in the HR world.

No spam. Unsubscribe anytime.